COMPLETED PROJECTS

OZG has realized the installation of 2 heat recovery steam generators belonging to Bandırma 920 MW Combined Cycle Plant which were produced by Nooter-Eriksen within the contract signed by A-TEC/Austria in 2009. Besides, OZG has completed the installation of blow-down, by-pass, gland-steam, condensate and coolant systems concerning the second phase of pipe installation in scope of Balance of Plant (BOP) together with the installation of feed water pumps, manufacturing and installation of steel structures, power supply for the construction site, installation of emergency diesel unit and feeder system, power distribution system for complete site and lightning system. Furthermore, OZG has realized the installation of auxiliary boiler unit within the contract signed by CLAYTON/BELGIUM.